20 Day Street Construction
Construction continues on the 3 story building
Snow lightly covers the ground as construction continues
Starting to dry in the 3 story building
Construction continues on the 3 story building.
Construction continues inside the building
Sheetrock stacked to the side as workers continue construction inside the building
A construction worker preparing to install ducting work
Outside light filters in through the widows of the construction site
Construction workers on ladders continue their work
Construction continues outside the building
Outside light filters in through the widows of the construction site
PVC pipes running the length of the hallway ceiling before the walls are dried in
Outside light filters in through the widows of the construction site
Construction worker, holding a ladder, looks up at a light
Construction on the roof of the building
Construction continues on the 3 story building
Construction continues on the 3 story building
Construction on the top story continues
A playground in the middle of a courtyard with the 20 Day St building construction continuing in the background
Bricks being set in concrete
Workers use heavy machines to fill the bricked area with concrete
A worker continues construction on the outside of the building
Building materials being stored in the parking garage
Construction continues, rolls of wire neatly piled
Outside light filters in through the widows of the construction site
Construction continues inside the building, work lights are strung down the hallway
Construction continues inside the building, work lights are strung down the hallway
Sheetrock stacked up as workers prepare to dry in the rooms
A smaller stack of sheetrock stacked up, workers have finished drying in this room
Outside light filters in through the widows of the construction site
Construction outside the building continues, scaffolding is on the right side
Construction outside the building continues
Construction outside the building continues
Construction outside the building continues, scaffolding reaching up to the 3rd story
Construction outside the building continues, scaffolding reaching up to the 3rd story
Workers continue construction on the outside of the building
Large flat bed truck dropping off more sheetrock
Workers continue construction on the outside of the building
Red and black pipes with pressure gauges
Construction continues inside the building
Workers begin to put the white and blue siding on the outside of the building
Workers continue to put the white and blue siding on the outside of the building
Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building
Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building
Workers continue to put the white and blue siding on the outside of the building and move on to the next side of the building
Workers continue to put the siding on the outside of the building and move on to the next side of the building
Workers have completed the siding on 2 sides of the building
Workers continue to put siding on the building using scissor lift
Workers continue to put siding on the building
Workers on scaffolding
Workers on scaffolding continue construction on the outside of the building
Construction outside the building continues, scaffolding reaching up to the 3rd story
Siding of building from street view
Siding of building almost complete
Boxes of materials stacked in the middle of the room
Kitchen cabinets stacked in the middle of the room
Kitchen cabinets are being installed
Materials stacked in the middle of the room as construction continues inside the building
Metal pipes stacked in front of an electrical panel
Construction continues inside the building; workers get ready to lay down flooring
Black wiring all comes together
Construction continues inside the building, materials stacked in the middle of the room
Construction continues inside the building
Construction materials stacked together
Construction continues inside, insulation has been put up in the hallway
Construction continues inside, the hallway has been painted
A stand up shower being installed
Freshly sodded playground with construction on the building happening in the background
Kitchen cabinets have been installed, the flooring is being prepared to go down
Kohler HVAC Unit
4 construction workers walking along a dirt road, past the freshly sided building